Spearville II - Kansas

In 2010-2011 Tri-City Electric Co. personnel partnered with Wanzek Constructors to install 32 GE Turbines at Kansas Wind Farm.
Tri-City Electric Co. installed foundation grounding and conduits, the underground collection system, tower wiring and performed the medium voltage terminations, testing and sub-station upgrades. Our team also participated in the commissioning and testing of the turbines.
Tri-City Electric Co.' structured cabling division was responsible for the installation of the SCADA system, which included fiber optic installation, termination and OTDR testing.
Tri-City Electric Co. was founded in 1895 as an electrical contractor and
supplier. Today, the organization is a nationally-ranked top 100
electrical contractor and has established itself as one of the Midwest's
premiere specialty contractors providing design/build, electrical
construction, telephone and voice mail systems, data communications,
engineering and integration, testing and preventive maintenance,
security and access systems, audio/visual and 24-hour emergency
services. Tri-City Electric Co. is headquartered in Davenport, Iowa.