The construction of the Green Chevrolet Solar project completed the Tri-City team consisted of a 461.7kW combination ballasted and a fixed tilt rooftop solar array with 796 – 580W bifacial modules and ten (10) inverters. The standing seam roof was reinforced by the Tri-City Ironworks team to accommodate for a larger system. The Tri-City team collaborated with the owner for a design/build project from conceptual design, financial modeling, engineering, procurement, and construction.